ARC Frame Cubicle Board, Magnetic Dry Erase, 14" x 11", White Surface, Satin Aluminum Frame

$45.50
Tax excluded
Quantity
Durable board delivers quality performance in personal workstations. Flexible mounting system secures to cubicles or dry-wall. Aluminum ARC™ frame.
Out of Stock

Durable board delivers quality performance when planning and organization are needed in personal workstations. Extend surface life with regular cleanings using Quartet® cleaning solutions. Flexible mounting system secures to cubicles or dry-wall. Hang lightweight board with simple pins during cubicle mounts. Adjustable clips ensure straight and level installation during dry-wall mounts. Fits any fabric-panel wall system, with or without overhead bins. Sleek, lightweight aluminum ARC™ frame complements any cubicle décor. Group with other Quartet® ARC™ Cubicle Boards for a complete organization system.
Quartet®
QRTARC1411

Data sheet

Package Includes
Includes mounting kit
Package Includes
Mounting Kit
Special Features
Magnetic Dry Erase Board
Special Features
Magnetic Dry Erase Board—Doubles as bulletin board and erases fast, with no staining or ghosting.
Special Features
Magnetic Dry Erase Board-Doubles as bulletin board and erases fast, with no staining or ghosting.
Mounting Details
Cubicle-Mount System (Included)
Mounting Details
Dry-Wall & Cubicle Mount Systems (Included)
Mounting Details
Dry-Wall Mount System (Included)
Mounting Details
Dry-Wall & Cubicle Mount Systems
Global Product Type
Dry Erase Boards - Cubicle/Workspace
Global Product Type
Boards-Magnetic Wet/Dry Erase
Pre-Consumer Recycled Content Percent
0%
Post-Consumer Recycled Content Percent
0%
Total Recycled Content Percent
0%
Frame Material
Aluminum
Frame Color
Silver
Board Type
Magnetic Dry Erase
Board Width
14"
Board Height
11"
Surface Material
Painted Steel
Surface Color
White
Frame Color/Finish
Satin
Unit Of Measure
EA
Board Surface Type(s)
Dry Erase
Magnetic Board Surface
Yes
Dedicated Projection Screen
No
Flipchart Mounting System
No
Preformatted Board Surface
No
Supports Custom Surface Formatting
No

No customer reviews for the moment.

16 other products in the same category: